A make-to-stock manufacturing system with component commonality: A queuing approach

Kwan E. Wee, Maqbool Dada

Research output: Contribution to journalArticlepeer-review

5 Scopus citations

Abstract

In this article a manufacturing system that features component commonality and a production allocation mechanism that postpones inventory commitment is modeled. Under this mechanism, which is called the First-Use First-Serve (FUFS), approach, a component is committed to an order only when all other required components become available. Furthermore, production of a component can only occur if its inventory is below a threshold. The performance of the proposed model is compared with the benchmark case of the First-Come First-Served (FCFS) approach under the sequence in which orders are received. The presented results show that FUFS outperforms FCFS on most system performance criteria. However, FCFS may outperform FUFS under some performance measures of dispersion, when the workload is heavy.

Original languageEnglish (US)
Pages (from-to)435-453
Number of pages19
JournalIIE Transactions (Institute of Industrial Engineers)
Volume42
Issue number6
DOIs
StatePublished - Jun 2010

Keywords

  • Component commonality
  • Make-to-order
  • Queuing theory
  • Supply chain management

ASJC Scopus subject areas

  • Industrial and Manufacturing Engineering

Cite this